Abstract

We consider the single-machine scheduling problem with release dates and job delivery to minimize makespan. Preemption is not allowed in the processing of the jobs. All jobs are first processed on a single machine and then delivered by a capacitated vehicle to a single customer. The vehicle can deliver at most c ≥ 1 jobs in each shipment. The round-trip transportation time between the machine and customer is a constant T > 0. The problem was proved to be strongly NP-hard and a 3/2-approximation algorithm was presented in the literature. In this paper we provide a polynomial-time approximation scheme (PTAS) for the problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.