Abstract

Grid resources are non-dedicated, and thus grid users are forced to compete with resource owners for idle CPU cycles. As a result, the turnaround times of both the grid jobs and the owners’ jobs are invariably delayed. To resolve this problem, the current study proposes a progressive multi-layer resource reconfiguration framework, designated as PMR-G, in which intra- and inter-site reconfiguration strategies are employed to adapt grid users’ jobs dynamically to changes in the available CPU resources at each node. The experimental results show that PMR-G enables the idle CPU cycles of a resource to be fully exploited by grid users with minimum interference to the resource owner’s jobs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.