Abstract

This article presents a procedure for designing rockfill toe protections with a highly permeable downstream shoulder to avoid mass sliding in dams during extremely high through-flow episodes. This accidental through-flow may be caused by reasons such as overtopping or leakage flow due to the loss of sealing at the impervious element of the dam or its foundation. The proposed protection is located at the downstream toe of the dam, and it is composed of highly permeable material, typically compacted rockfill. This material can be different from the rockfill forming the downstream shoulder of the main dam. The work is a result of a combination of numerical and experimental research carried out to analyze the influence of the geometry of the toe protection for given material properties of both dam shoulder and protection, when they can be considered highly isotropic. As a result of these studies, a design methodology is obtained. A series of validation tests are presented to support the reliability of the method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.