Abstract
Job precedence can often be seen in various manufacturing process scenarios. For instance, in the context of flow shop scheduling, certain jobs must be processed before a specific job may be executed. Formally, this scenario is known as precedence constraint, which influences the optimal job sequence. Because of this practical significance, in this study, a two-machine flow shop scheduling problem in which transportation times, breakdown time, and weighted jobs are considered. In addition to that, an ordered precedence constraint is considered that ensures a successor job cannot start on any machine before its predecessor job has been done on all machines. This is the first study that deals with flow shop scheduling problems with transportation times, breakdown time, job weights, and precedence constraints altogether, to the best of the author’s knowledge. To solve this problem, a simple and efficient solution methodology is developed that assures optimal or near-optimal solutions effectively. The developed algorithm is tested on various test instances and results are reported, which will be useful for future comparative studies.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.