Abstract

ABSTRACTA widely used unsupported underground mining technique is sublevel stoping, in which portions of ore-body within certain size constraints are extracted. In this article, a sequential approach is proposed to solve the sublevel determination problem, which is part of development and infrastructure planning, and the stope layout planning problem for polymetallic sublevel stope mining with pillars. First, a new algorithm is proposed to determine the sublevels, which focuses on minimizing the development costs while maintaining access to the profitable portions of the ore-body. Then, the stope layout is planned between the sublevels. A new mixed-integer linear programming formulation for determining the ultimate stope limits is introduced. A case study is conducted on a copper–molybdenum mine to demonstrate the proposed approaches. The results show that the output of the stope layout plan is within the optimal mining limits, which confirms the validity of the approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.