Abstract

Probabilistic risk assessment (PRA) is a relatively new tool in the nuclear industry. The Reactor Safety Study started the present trend of conducting PRAs for nuclear power plants when it was published in 1975. Now, nine years later, those in the industry currently using PRA techniques are frequently asked the same question: Why should the nuclear utility industry, with so many accepted analytical tools already available, invest the time and manpower to develop a new technique with so many uncertainties?

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.