Abstract

AbstractThe no-wait scheduling problem is a subclass of the flow shop. In a no-wait flow shop scheduling (NWFSS), jobs are not allowed to wait between consecutive machines. There is a continuous flow in the scheduling environment for jobs. In this research, a no-wait flow shop scheduling problem with setup times is considered in a fuzzy environment. The manufacturer cannot finish all jobs in order time due to the limitation of manufacturing capacity. Thus, the due dates of the jobs are considered as a fuzzy number. An improvement scatter search algorithm is used first to solve the NWFSS problem with a setup time to maximizing the satisfaction index objective. First, the proposed algorithm is tested on the benchmark NWFSS problems in the literature. Then, a benchmark NWFSS with setup times problem is solved by the proposed improvement scatter search algorithm(SSA) for fuzzy due dates. The results show that the proposed improvement scatter search algorithm is an efficient solution method for the NWFSS problem in a fuzzy environment. KeywordsNo- wait schedulingFuzzy due dateScatter search algorithmSatisfaction index

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.