Abstract

King's observation that a false impression could be gained from long-term savings that do not take account of the time value of money is no doubt true if all aspects and factors of comparative projects are taken into account. However, he must think readers a little naive if he offers his Fig. 3 as a full interpretation of the possible savings from installing the various levels of shipborne automation explored in my recent article. An examination of Section 8 (Cost Equations) will show that the DCF technique was deliberately discarded in order to simplify the argument. In fact, there was an additional note—deleted by the Editor through lack of space—which observed that the appraisal could be based on the assumption that the discount rate was equal to the escalation rate of the savings occasioned by taking into account the rise in wages, victualling, &c. over the equivalent project period.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.