Abstract
This work aims to find an efficient and fast solution for the problem of plant‐wide optimization of a large‐scale industrial process. The process is composed of a series of unit processes with coupling relationships between them, which leads to the problem of optimizing a large number of design variables and constraints. Therefore, the solution to the optimization problem is time‐consuming and the global optimum is obtained with a low probability. To efficiently solve the problem, a new plant‐wide optimization method is developed that decomposes the complicated optimization problem into several easier solvable sub‐problems based on the coupling relationships between unit processes. Two metrics, constraints coupling and indices coupling, are defined in order to measure the extent of a coupling relationship between pairs of unit processes. Then, the global optimum is found by successively solving the sub‐problems. Finally, the hydrometallurgy process of a gold smelter is demonstrated to evaluate the performance of the proposed method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.