Abstract
In this paper, a new model for estimating disassembly effort during early stages of product design is proposed. The model has been developed by integrating two well-known models in the field of product disassembly: Das et al. Disassembly Effort Index (DEI) model and Kroll and Hanft Disassembly Evaluation model. The first one is a multi-factor cost and effort model, which is widely used for determining disassembly effort in terms of a DEI score. This score is a representative of the total operating cost incurred in disassembling a product. The second model is commonly used for evaluating ease of disassembly, by assigning task difficulty scores to disassembly tasks. Data necessary for determining these scores are obtained from work-measurement analyses of standard disassembly tasks. The proposed model has been demonstrated by an estimation of disassembly effort for a CRT monitor disassembly process using the model and validated by benchmarking the results obtained using the proposed model against results from an existing model for a case study conducted on fifteen computer electronic products.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.