Abstract

It is proposed to employ melting rate, heat input, and detaching droplet diameter as controlled variables to control heat and mass transfer to work piece in a gas metal arc welding process. A two-layer architecture with cascade configuration of PI and MPC controllers is implemented to incorporate existing constraints on the process variables, improve transient behavior of the closed-loop responses and reduce interaction level. Computer simulation results are presented to indicate usefulness of the proposed controlled variables selection and applying two-layer control architecture to control heat and mass transfer to work piece.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.