Abstract

This paper considers a flow shop scheduling problems of n jobs on m machines involving processing times and weights of jobs with the major constraint as breakdown times of the machines. In this paper a new procedure is provided to obtain an optimal job sequence with the objective of minimize the makespan and mean weighted flow time by using neural network technique. To illustrate the proposed method procedure, a numerical example is given. The effectiveness of the proposed method is compared with many problems which are taken from different papers. This paper also provides a comparison of our proposed method with the existing methods in literature.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.