Abstract

In this paper, we propose a distributed approach using multi-agent paradigm for scheduling independent jobs and maintenance operations in the flowshop sequencing problem. The proposed system introduces a dialogue between two communities of agents (production and maintenance) leading to a high level of cooperation. It also provides a framework in order to react to the disturbances occurring in the workshop. This aspect is mainly concerned by corrective maintenance activities (machine breakdowns). The proposed multi-agent system is based on the integrated strategy which consists of a simultaneous scheduling of both production and preventive maintenance activities. The objective is then to optimize an objective function which takes into account both maintenance and production criterion. The main point is to show how the proposed multi-agent system is used to generate a joint production and preventive maintenance schedule that provides a better compromise between the satisfactions of respective objectives of the two functions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.