Abstract
The general distributed flexible job shop scheduling problem (DFJSP) involves three sub-problems: (1) operation-sequencing, (2) job-to-cell assignment, and (3) operation-to-machine assignment. Due to the variety of operations involved in large-scale and complex workpieces, it is difficult for a single manufacturing enterprise to finish all operations of some workpieces. Therefore, in addition to the above three sub-problems, the characteristic that some workpieces need to carry out operation outsourcing was also considered in this study, so that the model established in this paper was more in accordance with the actual situation of manufacturing enterprises than the existing studies. Besides, considering the increasingly prominent environmental problems and the increasing costs of environmental protection, the mathematical model of this paper includes four optimization objectives: makespan, costs, quality and carbon emission. To highlight the importance of each objective and improve the solving efficiency of related algorithms, we used the fuzzy analytical hierarchy process (FAHP) to transform the multi-objective problem into a single objective problem. Aiming at the above model, a hybrid genetic algorithm and tabu search (H-GA-TS) with three-layer encoding was developed in this paper. The algorithm combined the advantages of both genetic algorithm (GA) in global search and tabu search (TS) in local search, and realized the performance improvement when compared with the above two simple algorithms. The comparison experiment conducted performed in this study also verified the effectiveness and performance advantages of the hybrid algorithm over GA and TS.
Full Text
Topics from this Paper
Flexible Job Shop Scheduling Problem
Tabu Search
Operation Outsourcing
Hybrid Genetic Algorithm
Fuzzy Analytical Hierarchy Process
+ Show 5 more
Create a personalized feed of these topics
Get StartedTalk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
International Journal of Production Economics
Apr 1, 2016
Assembly Automation
Jan 17, 2020
Oct 6, 2021
Zenodo (CERN European Organization for Nuclear Research)
Apr 5, 2010
European Journal of Operational Research
Oct 1, 2009
Jul 1, 2020
IEEE Access
Jan 1, 2021
Journal of King Saud University - Computer and Information Sciences
Oct 1, 2022
European J. of Industrial Engineering
Jan 1, 2020
Computers & Industrial Engineering
Jul 1, 2016
Oct 1, 2008
Jan 1, 2018
Advances in Mechanical Engineering
Oct 1, 2018
Jun 25, 2008
Computers & Industrial Engineering
Computers & Industrial Engineering
Dec 1, 2023
Computers & Industrial Engineering
Dec 1, 2023
Computers & Industrial Engineering
Dec 1, 2023
Computers & Industrial Engineering
Dec 1, 2023
Computers & Industrial Engineering
Dec 1, 2023
Computers & Industrial Engineering
Dec 1, 2023
Computers & Industrial Engineering
Dec 1, 2023
Computers & Industrial Engineering
Dec 1, 2023
Computers & Industrial Engineering
Dec 1, 2023
Computers & Industrial Engineering
Dec 1, 2023