Abstract
The delay time concept and the techniques developed for modelling and optimising plant inspection practices have been reported in many papers and case studies. For a system comprised of many components and subject to many different failure modes, one of the most convenient ways to model the inspection and failure processes is to use a stochastic point process for defect arrivals and a common delay time distribution for the duration between defect the arrival and failure of all defects. This is an approximation, but has been proven to be valid when the number of components is large. However, for a system with just a few key components and subject to few major failure modes, the approximation may be poor. In this paper, a model is developed to address this situation, where each component and failure mode is modelled individually and then pooled together to form the system inspection model. Since inspections are usually scheduled for the whole system rather than individual components, we then formulate the inspection model when the time to the next inspection from the point of a component failure renewal is random. This imposes some complication to the model, and an asymptotic solution was found. Simulation algorithms have also been proposed as a comparison to the analytical results. A numerical example is presented to demonstrate the model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.