Abstract
Intermittent renewable energy resources like wind and solar introduce uncertainty across multiple time scales, from minutes to years, on the design and operation of power systems. Energy system optimization models have been developed to find the least-cost solution that manages the multi-timescale variability using an optimal portfolio of flexible resources. However, input data that capture such multi-timescale uncertainty are characterized with a long time horizon and high resolution, which brings great difficulty to solving the optimization model. Here we propose a model-adaptive time aggregation method based on clustering to alleviate the computational complexity, in which the energy system is solved over selected representative time periods instead of the full time horizon. The proposed clustering method is adaptive to various energy system optimization models or settings, because it extracts features from the optimization models to inform the clustering process. Results show that the proposed adaptive method can significantly lower the error in approximating the solution of the optimization model with the full time horizon, compared to traditional time aggregation methods.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.