Abstract

NP-hard scheduling problems with the criterion of minimizing the maximum penalty, e.g. maximum lateness, are considered. For such problems, a metric which delivers an upper bound on the absolute error of the objective function value is introduced. Taking the given instance of some problem and using the introduced metric, the nearest instance is determined for which a polynomial or pseudo-polynomial algorithm is known. A schedule is constructed for this determined instance which is then applied to the original instance. It is shown how this approach can be applied to different scheduling problems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.