Abstract
Cut-off grade controls the movement of materials among mining, processing and refining stages of an open pit mining operation. The cut-off grade policy constitutes a schedule of cut-off grades and the associated quantities of materials that flow through various stages over the life of operation. This flow of materials in the system relies on the grade-tonnage curve of the mineral resource and given that the variation in grade-tonnage curve is inevitable, it is crucial that the methods that define the cut-off grade policy must consider this grade uncertainty. However, with few exceptions, a majority of these methods ignore this uncertainty in the supply of materials. This paper shares a two-stage stochastic linear programming based cut-off grade optimisation model that accounts for the grade uncertainty and maximises the net present value (NPV) subject to the production capacity constraints over the life of operation. An application of the proposed method at hypothetical and realistic cases promises higher NPV as compared to the traditional heuristic approach.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.