Abstract

Due to the large capacity of large power transformers, normally the power capacity of a load test is difficult to meet the test requirement, which makes the ancillary devices such as induction regulator, intermediate transformer etc. difficult to meet the test demands too. The transformer factories with limited power capacity can only perform load test under less than fifty-percent of the rated load current, which not obeys the standards and technical protocols. Thus, a field load test method for large power transformers is proposed in this paper. It carries out the reactive power compensation with compensation capacitors, which reduces the capacity of test power supply and makes the field load test possible. This method also gives a guarantee for the safe and stable operation of power transformers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.