Abstract

The Mars Surveyor '98 program recently sent two spacecraft to Mars, consisting of an Orbiter and Lander launched separately on Boeing Delta 7425 launch vehicles. The Mars '98 mission was to have added to the knowledge gained by the Mars Global Surveyor and Mars Pathfinder missions. Unfortunately, both vehicles were unable to complete their missions upon reaching Mars. This paper describes the requirements, design and operational cruise performance of the Mars Climate Orbiter (MCO) and the Mars Polar Lander (MPL) Electrical Power Systems, including detailed discussions on each of its key components. A technical risk assessment of implementing a single battery EPS design is included, along with a detailed comparison of this architecture to a block redundant EPS architecture incorporating redundant batteries. The paper concludes with a discussion of additional present and future spacecraft mission applications utilizing this EPS architecture and the associated benefits to these missions. It should be noted that the single battery Electrical Power Subsystem (EPS) approach in no way contributed to the loss of either of these spacecraft.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.