Abstract

<p>This paper presents some results obtained in the Infravation research project called “Fast and effective solution for steel bridges life-time extension” (FASSTbridge). The aim of this project is to develop and demonstrate a reliable, preventive, cost-effective and sustainable solution for steel bridges fatigue life-time extension. As a demonstration example, the Jarama Bridge was selected in this project. The Jarama bridge is located in the outskirts of the city of Madrid, over the river Jarama on road M-111, and has a total length of 115,5m and 5 spans (max span length 33,5m). Erected in the 1960s, it has suffered since then a considerable increase of traffic flow which was not considered at its design stage. This paper leads a cost-benefit analysis and a life cycle analysis of the CFRP solution compared with traditional techniques (use of steel plates) and considering the economic and environmental profit of the preventing policy. The aim is to adopt a preventive strategy to allow road administrations enlarging the service life of steel and composite steel bridges in a cost-effective and sustainable manner.</p>

Full Text

Published Version
Open DOI Link

Get access to 115M+ research papers

Discover from 40M+ Open access, 2M+ Pre-prints, 9.5M Topics and 32K+ Journals.

Sign Up Now! It's FREE

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call