Abstract

AbstractOne of the most challenging tasks of water supply utilities is planning the timing and quantity of new water supply sources as demand for water consumption grows. Many water supply utilities target on meeting 100% of their customers' needs based on scenario‐based deterministic demand projections numbers even though there are uncertainties in both supply and demand values. This may result in under or overly conservative approach in assessing future needs. In this article, a level‐of‐service concept is introduced to capture a utility's willingness to accept a given level of risk, plan for it, and invoke a management strategy during extreme events than build a facility to accommodate those in planning for new water supply sources. Accounting for uncertainties in both supply and demand help quantify reliability by achieving a prescribed level of service. The major benefit of such an approach for planning future water supply is that it allows policy makers to evaluate the use of adaptive water management strategies and develop supply in an incremental fashion as demand warrants it. For example, if a given level of service cannot be reliably met with the existing system at a future time t, an incremental water supply project would come online to bring the required reliability level up but no more.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.