Abstract

Abstract Existing transmission planning models consider basic aspects of the problem. In practice, a transmission utility needs to model other important details such as operation cost of the power system. In this article, a least cost transmission expansion model is proposed considering the operation cost in order to model the trade-off between building new transmission capacity and increasing the power system’s operation cost. The proposed model is transformed into a mixed integer linear programming problem using linearization techniques and solved with CPLEX. Finally, results of the model for the Garver test system and IEEE 24-bus test system are shown.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.