Abstract
Bottom vacuum preloading (BVP) is the method of applying vacuum pressure at the bottom zone of soils to generate pore-water pressure difference between the top and bottom boundaries, thereby achieving the consolidation drainage. This study conducted a large-size model test to explore the engineering feasibility of combining self-weight and BVP to treat construction waste slurry (CWS). Through the treatment of the measures of self-weight consolidation (0–26 d) and BVP with a water cover (26–78 d), the average water content of CWS declined from 255.6% to 115.9%, and the volume reduction ratio reached 0.476. However, since these two measures could properly treat only the bottom CWS, the measures of BVP with the mud cover (78–141 d) and the natural air-drying (141–434 d) were performed to further decrease the CWS water content near the upper zone. The latter two-stage measures reduced the average water content of CWS to 84.9% and increased the volume reduction ratio to 0.581. Moreover, the measurements suggested that the treated CWS largely exhibited a shear strength of 10 kPa or more. Overall, the proposed approach appeared some engineering feasibility to treat CWS, and the performed test study could act as a reference for the practical treatment of CWS.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.