Abstract

Constructs a knowledge‐based simulation model for job shop scheduling simulation techniques to build the initial status of the knowledge base. Uses the simulation experiments to study the effect of technological factors, such as machine loading conditions and criteria of scheduling performance requirements, on the selection of scheduling priority rules. Implements the model with real workshop data to test its validity to cater for real‐world situations such as machine group centres, more than one machine and the availability of operators. The proposed model yields satisfactory results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.