Abstract

We consider the problem of scheduling a number of jobs, each job having a release time, a processing time, a due date and a family setup time, on a single machine with the objective of minimizing the maximum lateness. We develop a hybrid genetic algorithm and validate its performance on a newly developed diverse data set. We perform an extensive study of local search algorithms, based on the trade-off between intensification and diversification strategies, taking the characteristics of the problem into account. We combine different local search neighborhood structures in an intelligent manner to further improve the solution quality. We use the hybrid genetic algorithm to perform a comprehensive analysis of the influence of the different problem parameters on the average maximum lateness value and the performance of the algorithm(s).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.