Abstract

This paper discusses the U-shaped assembly line balancing problem in case of stochastic processing time. The problem is formulated using chance-constrained programming and the greedy randomized adaptive search procedure is used to solve the problem. In order to prove the efficiency of the proposed algorithm, 71 problems taken from well-known benchmarks are solved and compared with the theoretical lower bound and 13 of them were compared with another approach used to solve the same problem in another paper, which is beam search. The results show that 59 problems are the same as the theoretical aspiration lower bound. In addition, the results of 11 of 13 problems compared with beam search are the same and the results of 2 problems are better than beam search. The t-test statistics is applied and showed that there is no significance difference between the proposed algorithm and the theoretical lower bound thus, the proposed algorithm shows efficiency when compared with the aspired values of the theoretical lower bound.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.