Abstract

This paper addresses the aggregate production planning problem with different operational constraints, including production capacity, workforce level, factory locations, machine utilization, storage space and other resource limitations. Three production plants in North America and one in China are considered simultaneously. A pre-emptive goal programming model is developed to maximize profit, minimize repairing cost and maximize machine utilization of the Chinese production plant hierarchically. A set of data from a surface and materials science company is used to test the effectiveness and the efficiency of the proposed model. Results illustrate the flexibility and the robustness of the proposed model by adjusting goal priorities with respect to importance of each objective and the aspiration level with respect to desired target values.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.