Abstract
Abstract The uncertainty of load forecasting can lead to certain risks in generation expansion planning. Different from the traditional large-capacity unit planning in the past, renewable energy has the characteristics of small single-machine capacity and fast construction speed, etc. The uncertainty of load forecasting will have a more significant impact on the results of generation expansion planning including renewable energy. For this reason, this paper proposes a generation expansion planning idea considering load forecast uncertainty based on conditional value-at-risk (CVaR). Firstly, scenario technology is used to simulate the uncertainty, and CVaR is introduced to quantify the risk of generation expansion planning. Then, considering the coordinated development of traditional and renewable energy sources, a generation expansion planning model that considers risk is established to minimize the total costs. Finally, the effectiveness of the model was verified through a case study, and this model has reference significance for balancing the economy and reliability in generation expansion planning.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.