Abstract

Scheduling method have been investigated for Just-In-Time (JIT) production systems with painting process that has longer lead time than the planning period of assemble line, followed by the painting prosess. In such JIT production systems, it is difficult to keep stable production between painting process and assemble line.Therefore, it is necessary that painting process has independent production schedule forecasted on the processing requirement jobs of assemble line. However, when multi-volume production is done or defective jobs occur in painting process, production balance between painting process and assemble line is destroyed, and then delays of due dates often occurred. To cope with this difficulty, we propose a scheduling method based on heuristic algorithm for painting process in the JIT production system in order to prevent delays of due date and to keep the smallest inventory in buffer of painting process. We have evaluated the scheduling method by computer simulation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.