Abstract

After completion, oil wells often require intervention services to increase productivity, correct oil flow losses, and solve mechanical failures. These interventions, known as workovers, are made using oil rigs, an expensive and scarce resource. The workover rig scheduling problem (WRSP) comprises deciding which wells demanding workovers will be attended to, which rigs will serve them, and when the operations must be performed, minimizing the rig fleet costs and the oil production loss associated with the workover delay. This study presents a data-driven optimization methodology for the WRSP using text mining and regression models to predict the duration of the workover activities and a mixed-integer linear programming model to obtain the solutions for the model. A sensitivity analysis is performed using simulation to measure the impact of the regression error in the solution.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.