Abstract

Construction project managers come from diverse backgrounds and may, therefore, lack the knowledge set currently required in order to be competent and effective in practice. The aim of this article is to establish the National Qualifications Framework (NQF) level of each type of knowledge area required for a competent and effective construction project manager in South Africa. These levels of knowledge are important, in order to develop a proposed construction project management knowledge model to be used by the construction industry. A mixed methods research design was used, including structured questionnaires (n = 40), interviews (n = 10), and a single case study. The questionnaire survey, using closeended questions measured on a 5-point Likert scale, tests the importance of and rated the NQF qualification levels of each knowledge type fit for project managers in the built environment. The rating assisted in knowing to what knowledge depth project managers need to be educated and trained. Interviews were conducted with 10 construction professionals to obtain their views on the importance of industry-specific knowledge of a construction project manager and to critically review the form of knowledge considered essential. The case study of a building project to the value of R35 million was used to gain understanding of the impact that industry-specific knowledge, or the lack thereof, may have on the successful completion of a project. Results showed that qualifications to gain industry-specific knowledge should at least be on NQF level 6; a qualification on NQF level 7 is recommended to gain adequate project management knowledge (theory). These findings are important, as some construction project management courses in South Africa are currently below NQF level 6. This may be contributing to industry not producing construction project managers with the required knowledge set. The proposed model outlines the adequate knowledge sets and level thereof that can be used when designing training and educational degrees for construction project managers. The proposed model could also be used in practice as a guideline for placing or promoting construction project managers. Keywords: Construction project management, knowledge model, type of knowledge, NQF knowledge level, South Africa

Highlights

  • The Project Management Institute (PMI) Pulse of the Profession highlighted that the high cost of low performance resulted in organisations, globally, wasting US$122 billion for every US$1 billion spent on projects, due to poor project management

  • The aim of this article is to establish the National Qualifications Framework (NQF) level of each type of knowledge area required for a competent and effective construction project manager in South Africa. These levels of knowledge are important, in order to develop a proposed construction project management knowledge model to be used by the construction industry

  • In terms of the guidelines stipulating type of knowledge that project managers should have, this study focused on the nine PMBOK knowledge areas from the PMI PMBOK guide 4th edition 2008 and did not include the 5th edition, as the study was conducted prior to the release of the 5th edition

Read more

Summary

Introduction

The PMI Pulse of the Profession highlighted that the high cost of low performance resulted in organisations, globally, wasting US$122 billion for every US$1 billion spent on projects, due to poor project management. Organisations that use formal project management practices waste 13 times less money than organisations that do not (PMI, 2016). Organisations use project managers with the necessary knowledge about techniques that are used to ensure successful management of projects (Burke, 2013: 1-5; Chordas, 2008: 66-69; Kerzner, 2013: 2-10; PMI, 2016). Organisations in the built environment rely heavily on the proficiency of construction project managers (Orr, 2004: 1). As the market place is highly competitive, organisations in the built environment will benefit in knowing what type of knowledge construction project managers require and to what level it should be (Peterson, 2008: 38-42)

Objectives
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.