Abstract
Heuristics that explore specific characteristics of the problem are essential to find good solutions in limited computational time for many practical systems. This paper first presents a constructive heuristic, namely improved standard deviation heuristic (ISDH), by combining the standard deviation heuristic (SDH) with the procedure of effective double-job-insert-operator. Then, a composite heuristic, improved standard deviation heuristic with iteration (ISDHI), is proposed using the iteration operator to improve the solutions of the ISDH. Extensive computational experiments are carried out based on a set of well-known flow shop benchmark instances that are considered as no-wait flow shop scheduling instances. Computational results and comparisons show that the ISDHI performs significantly better than the existing ones, and the ISDHI heuristic further improves the proposed constructive heuristics for no-wait flow shop scheduling problem with total flow time criterion.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.