Abstract

A continuous lab-scale integrated bio-system was conducted to treat sewage wastewater from Abu-Rawash wastewater treatment plant (WWTP). The bio-system showed high efficiency in removing chemical oxygen demand (COD), biological oxygen demand (BOD5), and total suspended solids (TSS). The experimental analysis results indicated that the maximum COD removal and methane yields were 97.6 and 13.74 mmol CH4/Kg COD at a hydraulic retention time (HRT) of 6 h, respectively. Zn, Mn, and Fe were removed at a high rate of up to 96.6%. The sponge bio-carriers have improved overall treatment performance and substantially improved mixed liquor volatile suspended solids/mixed liquor suspended solids (MLVSS/MLSS) ratio at an appreciated range, and the total pathogenic organisms were removed up to 99.8% in the second stage. Because the innovative bio-system enables a rapid startup process, is simple to use, and is inexpensive, it can provide an economically feasible alternative for wastewater management and could be extended to full-scale applications for agricultural purposes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.