Abstract

Abstract In this study, effects of the combination of meter replacement and active leakage control on real and apparent losses are investigated. Generally, water meter replacement campaigns, SCADA system operation, data analysis studies and physical leak detection activities are carried out by different units in water utilities. Within the scope of this study, the studies carried out by different units of the water utility were carried out in an integrated manner in the same period and the obtained data sets were analysed together. Thus, water losses, which were at the level of 52% in the pilot study area (PSA), were reduced to 35%. When the volumes of water supplied to the system before and after the study are compared, the volumes after the study were decreased. Also, water losses in the PSA have been reduced by 17%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.