Abstract

Abstract: A production scheduling problem for hot rolling seamless steel tube at Tianjin Pipe Corporation of China is studied. Considering the complexity of the problem and the acceptable time for solving it, a rule-based heuristic approach is proposed and implemented. The proposed approach is a bottleneck scheduling method and considers simultaneously all production processes in three production units and ‘optimizes’ them as a whole. Additionally, the running result shows, on average, that a 3% increase in throughput and a 5% reduction in late deliveries have been achieved since the system implementation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.