Abstract

Hardware scheduling is a well-known and well-studied problem. This paper defines a new SAT-based formulation of automata-based scheduling and proposes for the first time a completely new resolution algorithm based on SAT solvers and bounded model checking (BMC). The new formulation is specifically suited to control-dominated applications. Alternative executions are modeled as concurrency, where alternative behaviors are followed in parallel. This approach produces "single-path" scheduling traces instead of standard "treelike" solutions, thus enabling the use of BMC. This choice, however, creates the problem that resource bounds are treated incorrectly, due to the artificial concurrency modeling alternative behaviors. We then discuss how to take this into account, either by modifying the SAT solver or by adding extra clauses. Thus we are able to exploit SAT-based BMC to find the desired minimum latency schedule. Our method shows significant improvements in terms of both computational efficiency and modeling power, when compared to the BDD-based approach, and in terms of the optimality of the results when compared to heuristic methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.