Abstract

With the burgeoning of remote sensing and space technology, multi-satellite collaborative mission planning, which is the key to achieving efficient Earth observation, has become increasingly intricate due to the expanding complexity and volume of observation missions. Addressing the multi-satellite collaborative mission planning problem, which is characterized by its two-stage decision-making process involving mission assignment and resource scheduling, this study investigates a comprehensive joint decision making that encompasses both mission assignment and resource scheduling and comprehensively optimizes the mission completion rate, the mission profit rate, and the satellite resource utilization rate. Considering the interaction of these decisions, we formulate the problem as a bilevel programming model from a game-theoretic perspective and propose a nested bilevel improved genetic algorithm (NBIGA) for its solution. Simulation experiments substantiate the applicability of the bilevel programming model in joint decision making for the stages of mission assignment and resource scheduling in multi-satellite collaborative mission planning, as well as the robustness of the NBIGA. A comparative analysis with the nested bilevel genetic algorithm (NBGA) confirms that the algorithm proposed in this study can achieve superior optimization outcomes and higher solving efficiency.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.