Abstract

We consider online scheduling of unit length jobs on m identical parallel-batch machines. Jobs arrive over time. The objective is to minimize maximum flow-time, with the flow-time of a job being the difference of its completion time and its release time. A parallel-batch machine can handle up to b jobs simultaneously as a batch. Here, the batch capacity is bounded, that is b < ∞. In this paper, we provide a best possible online algorithm for the problem with a competitive ratio of [Formula: see text].

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.