Abstract

ABSTRACTThe International Space Station (ISS) verification challenge was developing a process that ensured the verification of lots of requirements for a very complex system. The ISS integrated verification process was developed to provide a disciplined engineering approach for the verification of the ISS specification requirements and to provide a traceable archive of verification data needed to sustain ISS operations. The ISS integrated verification process has proven itself to be a tried and true structured process that can be adapted to any type of simple or complex system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.