Abstract
AbstractThis paper exposes methodologies, based on testing strategies (Start‐Small and Multiple‐Clue), able to support two main steps of Airbus systems development process: formal specification validation activities and systems testing activities on Airbus Final Assembly Line (FAL). The experiments show that these methods can quantify testing efforts, guide functional tests definition, facilitate detailed design coverage activities and ease fault location.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.