Abstract

Normal operation sedimentation basin flushing systems require large volumes of water, typically up ten times of the deposited sediment volume for efficient flushing. A complete sediment removal, can only be realized by combination of mechanical removal with drawdown flushing. This operation reaches much longer operation time resulting in water loss and reducing power and energy production of Mini Hydro Power Plant (MHPP). The objective of this study is to improve the flushing system of sedimentation basin based on a numerical approach. Fluid motion is described with non-linear, transient, second-order differential equations. A numerical solution of these equations involves approximating the various terms with algebraic expressions. The resulting equations are then solved to yield an approximate solution to the original problem. The simulation result shows that the 3D numerical modeling of flow in sedimentation basin gives the reasonable result to predict the suspended load movement in the flow.

Highlights

  • Mini Hydro Power Plant has installed an 6,7 MW mini hydro power plant located in Pasir Melayu Village, Sialu Kahean Sub District, Simalungun District, North Sumatera

  • A complete sediment removal, can only be realized by combination of mechanical removal with drawdown flushing. This operation reaches much longer operation time resulting in water loss and reducing power and energy production of mini hydro power plant

  • The flow magnitude tends to be higher in the left chamber. This is caused by the release square hole location of right chamber from center line of basin not similar position compared to the left one

Read more

Summary

Introduction

Mini Hydro Power Plant has installed an 6,7 MW mini hydro power plant located in Pasir Melayu Village, Sialu Kahean Sub District, Simalungun District, North Sumatera. It has experienced severe problems with silt in the head-works and subsequent damage to equipment. A complete sediment removal, can only be realized by combination of mechanical removal with drawdown flushing. This operation reaches much longer operation time resulting in water loss and reducing power and energy production of mini hydro power plant. It is important to have an effective and efficient sedimentation basin

Objectives
Findings
Discussion
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.