Abstract

A 25 500 t semi-submersible drilling rig, the RBS- 8M, was assembled on shore in the Hyundai Heavy Industries fabrication yard in Ulsan (Korea) during 1999. The major components—the two 6000 t hull pontoons and the 11 000 t deck—were assembled at ground level and brought together to form the completed vessel during a period of only a few days. This was the first time such an operation on this scale had been attempted. This paper describes the design, construction and performance of the temporary structures that lifted the 11 000 t deck to a height of 38 m above yard level. The lift is known as the RBS- 8M 11 000 t deck superlift.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.