Abstract

Present article reviews coordination of time delays between relay protection and automation (RPA) system existing at oil pumping station (OPS) and power supply system in order to ensure self-starting conditions safe for synchronous electric motors (SEM) of main pumping units. Coordination of RPA time delays is considered for the cases, when one of OPS power supply sources fails due to short circuit, with further SEM self-start upon elimination of short circuit.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.