Abstract
The amount of metal to phosphorus removal is estimated by the graph developed by experimental data in wastewater treatment facility. However, the active sites on the surface of metal hydroxide are claimed to involved in chemical phosphous removal model in EQPS21. In order to evaluate the compatibility of model in EQPS21, various simulations are carried out to compare with the results from literature. It is found that simulation results are well agreed with experimental data in literature. The simulation results prove that the velocity gradient at metal injection point plays a major role in chemical phosphorus removal. When velocity gradient is 20 1/s, Al corresponding of molar ratio of 4.7 has to be injected to raw sewage to have 0.2 mg/L of effluent PO4-P concentrations. However, when velocity gradient is 200 1/s, Al corresponding of molar ratio of 2.4 is required to have same effluent PO4-P concentration.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Korean Society of Urban Environment
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.