Abstract

According to existing regulatory documents, assignment of wind loads for buildings and constructions of high level of responsibility must be carried out on the basis of results of modeling tests in wind tunnels. High level of responsibility can be conditioned not by technical complexity and spatial originality of the designed object, but only by its production purpose, affiliation to capital construction object of railway infrastructure of public traffic and geometrical dimensions. The paper considers an assessment of permissibility of using typical schemes from the SP 20.13330.2016 attachment at assignment of wind loads for buildings and constructions related to buildings and constructions of high level of responsibility according to the principle of their production purpose. For that reason the authors have carried out a set of aerodynamic tests for a selected object of high level of responsibility.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.